Strathcona Park Lodge
Campbell River, British Columbia, Canada
Statistics:
 |
Turbine: One double nozzle Pelton |
 |
Generator: 120kW Potencia @ 1200 RPM |
 |
Rated head: 156m |
 |
Rated flow: 0.05m3/sec |
 |
Commissioned: 2024 |
This new hydroelectric system is an upgrade and expansion to an existing 75kW system installed in 1989. The hydropower plant supplies power to the lodge and outdoor education centre which can host up to 225 guest at a
time and 75 resident staff. With addition of load management panels, the new system can support the electricity needs while generating at a lower output during low water level during summer months.
|