Statistics:
Turbine: Two (2) twin nozzle Turgo turbines
Generator: Two (2) 2250kW Generators @ 750 RPM
Rated head: 136.8m
Rated flow: 2.05m3/sec per turbine
Commissioned: 2024
This powerplant is expected to produce 27.51 GWh of electricity per year for the Aceh province in the Sumatera Island where the existing supply is unable to meet the demand which has been increasing.
Two Nozzle Turgo Turbines
Powerhouse
Inlake
Back to Projects page.
Back to Top
© Copyright 2026 Dependable Turbines Ltd. All rights reserved.